STARTED PROJECTS:
Access Pipeline Inc.
Midwest
has been awarded the Winter North Spread of the Access Pipeline Project. The pipeline section includes the
installation of 127 kilometres of dual NPS 16 and NPS 24 pipelines in a common
trench from Lac La Biche to Conklin, Alberta.
The work will be completed in April 2006.
COMPLETED PROJECTS:
Duke Energy Gas Transmission – Blackburn Pipeline Replacement Project
Midwest
completed the project in November 2005.
The project included the rreplacement of 2.7 km of NPS 30 near Prince George, BC.
TransCanada PipeLines Limited - Edson Gas Storage Project
Midwest
completed the project in October 2005.
The project included the installation of 9.8 km of NPS 16 natural gas pipeline and
the installation of 10 riser assembles to connect storage wells to the Edson
Gas Plant near Edson, AB.
TransCanada PipeLines Limited – Big Eddy Pipeline
Midwest
completed the project in October 2005. The project included the installation of 1.6 km of
NPS 30 natural gas pipeline connecting the Grande Prairie Mainline to the Edson
Gas Plant near Edson, AB. The work
included the hot tap support and the valve assembly installation on the Grande
Prairie Mainline.
Suncor Energy Inc. - North Cabin Pipeline Project
Midwest
completed the project in November 2005.
The project included the installation of 101 km of NPS 12 and 3 natural gas pipelines
in a common trench; and the installation of 3 km of NPS 6 natural gas pipeline
near Grande Cache, AB. The work
included the installation of 15 ESD (Emergency Shut Down) sites.
TransCanada PipeLines Limited – NCC (Peerless Lake Section) Phase 2
Pipeline Project
Midwest
completed the project in March 2005.
The project included the installation of 39 km of NPS 24 natural gas pipeline near
Wabasca, AB. The project successfully
implemented the Advanced Integrity Validation (AIV) process, thus eliminating
the requirement for hydrostatic testing of the pipeline. The industry leading process was validated
by hydrostatically testing one section to confirm the quality assurance of the
pipeline integrity. All tie-in welds
were completed utilizing the Midwest Autoweld equipment for the fill and cap
passes.
Want more info on any of these happenings?
E-mail us at: dziehr@midwest.ab.ca or
use our handy Contacts Page.
| Home | Automated Welding | Corridor
Pipeline Project |
| Leaders in the Pipeline Industry | Local and Aboriginal Opportunities |
| Pipeline Integrity Work | Safety, Health and Environment | AMEC plc |
Copyright © 1997 Midwest Management (1987) Ltd. All Rights Reserved.